Notre actualité

Suivez nous sur les réseaux sociaux pour découvrir toute nos actualités 

Q3 2026 Video Newsletter
News & Projects

The third-quarter video newsletter is now available.

In this new edition, we highlight a project carried out on a timber drying line at a sawmill, with a specific challenge: to replace the existing heat exchangers whilst maintaining thermal output and minimising the risk of fouling.

A technical project on wood drying

In an environment containing sawdust and wood dust, thermal performance does not depend solely on the installed capacity. Pressure drops, fouling, maintenance and on-site integration must also be taken into account right from the design stage.

For this project, our teams worked on replacing two batteries that were leaking due to wear and tear and the build-up of wood particles. The aim was to maintain 800 kW of thermal power, whilst adapting the design to the actual operational constraints.

The design team’s work focused in particular on optimising the fin pitch, which was increased from 2 mm to 6 mm, in order to facilitate airflow, minimise particle build-up and improve the long-term durability of the heat exchangers.

Also in this newsletter

This video also showcases our upcoming event at STEP by Pollutec, on 1 and 2 December 2026 at Paris Expo Porte de Versailles.

This trade fair provides an opportunity to discuss practical solutions relating to the green transition, energy efficiency and the decarbonisation of industry.

We are also delighted to welcome Yacoub, who is joining us on a work-study scheme to strengthen the sales team. His role will be to support business development, help manage enquiries and contribute to our relationships with clients and prospective customers.

Discover the video newsletter:

Do you have any questions? Please do not hesitate to contact us!
You can also find all our news, projects and solutions for heat exchangers and heat recovery on our website.

What are you looking for?