The request
In commercial buildings, air handling units play a vital role in ensuring indoor air quality, thermal stability and the energy efficiency of HVAC systems.
TRIANON ÉCHANGEUR recently completed a project to replace custom-made air handling units for an installer specialising in office ventilation systems.
The intervention concerned:
3 hot coils
1 cold coils
1 droplet separator
The objective was to maintain the performance of the air handling unit while improving the sustainability and energy efficiency of the system.
Why replace an air handling unit?
In urban environments, CTA batteries are exposed to:
fouling by fine dust
corrosion caused by polluting particles
the deterioration of metal frames
In this project, the existing batteries presented:
significant fouling of the fins
advanced oxidation of frames
These damages reduce:
heat exchange efficiency
ventilation energy performance
the quality of the air treatment.
Replacing the batteries therefore restores the thermal performance of the air handling unit.
Custom CTA battery design
The project required an identical replacement in a technical environment that could not be modified.
Our teams therefore achieved:
a precise measurement of dimensions
reproduction of a non-standard frame
the integration of a filter slide
a removable cover plate for easy maintenance
This approach allows for the installation of a customised air handling unit that is fully compatible with the existing AHU.
Optimisation of blade pitch
In urban environments, air handling units are particularly exposed to dust and fine particles.
We therefore optimised the geometry of the heat exchanger by increasing the fin pitch to 4 mm.
This design allows:
to limit the clogging of the fins
to maintain thermal performance
reduce maintenance requirements.
Sustainable materials for urban environments
The old batteries were heavily encrusted and the frames were oxidised.
To improve the durability of the new heat exchangers, we have chosen:
stainless steel frames
copper pipes
aluminium fins
This combination ensures good thermal conductivity and increased corrosion resistance.
Integration of recovery batteries
The system also incorporates heat recovery batteries on the extracted air.
This solution allows the fresh air being blown in to be preheated, thereby reducing energy consumption for heating.
Recovery heat exchangers contribute directly to improving the energy performance of commercial buildings, in line with the objectives of the Commercial Buildings Decree.
Expertise in heat exchangers for air treatment
This project illustrates TRIANON ÉCHANGEUR’s ability to:
design customised air handling units
adapt to existing technical installations
improve the sustainability of equipment
optimise the energy efficiency of ventilation systems.