Taking measurements of a heat exchanger: how to carry out an accurate on-site survey?
Taking measurements of the heat exchanger
Taking measurements of a heat exchanger is an essential step prior to any replacement, retrofit or bespoke manufacturing project. When manufacturer’s drawings are unavailable or the equipment has become obsolete, an accurate measurement of the dimensions enables the design of a solution that is fully compatible with the existing installation.
At Trianon Échangeur, we carry out on-site measurements throughout France to ensure the smooth running of your industrial heat exchanger replacement projects.
This video is hosted by YouTube.
To watch it, please accept marketing cookies.
How do you take measurements of a heat exchanger?
This video shows a real-life project carried out by our teams on a heat exchanger installed in an air handling unit. The aim is to gather all the information needed to manufacture a replacement heat exchanger that is fully compatible with the existing system.
Download the document to create your dimension drawing:
What is an exchanger reading?
Taking measurements of a heat exchanger involves accurately recording all the dimensions, connections and installation requirements necessary for its replacement or reproduction.
This is particularly important when:
- the manufacturer’s plans are unavailable;
- the heat exchanger is old or obsolete;
- the manufacturer no longer exists;
- the aim is to improve performance;
- An identical replacement is required.
An accurate set of measurements helps to minimise the risk of errors when designing the new equipment and ensures compatibility with the existing installation.
Our methodology
List of general dimensions
- overall length
- fin length
- width
- finned height
- overall height
- thickness
List of connections
- diameter
- type of connection
- orientation
- centre-to-centre distances
Manhole inspection
- position
- diameter
Technical inspection
- number of rows
- number of tubes
- a fin pitch
- materials
Environmental analysis
- access
- handling
- dimensions
- installation requirements
The most common mistakes when taking measurements of a heat exchanger
- Forget about the connections
- Ignoring handling requirements
- Record only the main dimensions
- Failure to check the direction of traffic
- Ignore installation tolerances
An error of just a few millimetres can sometimes make it impossible to fit the new heat exchanger.
Frequently asked questions about taking heat exchanger measurements
Yes. Our technicians travel throughout France to take measurements of heat exchangers, air handling units and other industrial heating and cooling equipment. For more complex jobs or specific projects, each request is assessed on a case-by-case basis by our design office so that we can offer the most suitable solution.
The cost of taking measurements for a heat exchanger starts at €500 excluding VAT. The price may vary depending on the site’s location, the accessibility of the equipment, the time required for the work, and the complexity of the survey to be carried out.
When access to the coil is restricted or impossible, it is often still possible to select a replacement heat exchanger based on the available external dimensions. The overall dimensions (width and height), the dimensions of the air passage, and the centre-to-centre distance between the headers can usually be measured from outside the unit. Our design team then analyses the available information to determine the most suitable solution.
Yes. We provide measurement sheets to help you record all the dimensions required for the design of your heat exchanger. These documents set out the measurements to be taken and the technical details to be provided, to facilitate the preparation of a quotation for replacement or manufacture.
Yes, in some cases. If you have the original 2D or 3D manufacturer’s drawings, it is often possible to carry out the design work without needing to visit the site. It is also possible to send the heat exchanger or coil to our workshops so that we can take all the necessary measurements ourselves, which may help to reduce the overall cost of the project.